News

Kazakhstan Project HL-6 Team received Party A’s KAM reward

Date 2012-04-19

In Party A’s KAM drilling construction, the Kazakhstan Project HL-6 Team’s reached Party A’s requirements for the three wells of K174, K176 and K192 in aspects of construction cycle, and site management, for which it received 200,000 KZT (about USD1351), 100,000 KZT (about USD676) and 300,000 KZT (about USD2027) in bonus respectively.

 

K174 Well needs winter operation, the drilling cycle is 11 days; K176 Well needs summer operation, the drilling cycle is 11 days; K192 Well also needs summer operation, the drilling cycle is 9 days. The drilling cycles of these three wells all exceed Party A’s indicator.

 

KAM project features harsh climate environment, in winter the temperature drops to 30 degrees below zero, in summer the temperature rises to 50 degrees. All members of HL-6 Team have no fear of coldness and heat, aiming to establishing Hilong’s brand image, they overcame all difficulties to safely and successfully completed construction tasks of all the wells, and recorded outstanding performance, which enhanced Hilong’s competitiveness in the Kazakhstan market.

 

看个球nba免费直播

HL-6 drill rig towering at Kazakhstan well site